SMART WTE
|
|
|
Cypark Sdn. Bhd.
|
|
|
|
Ladang Tanah Merah, Negeri Sembilan
|
|
|
|
|
|
- Solid Waste Modular Advanced Recovery and Treatment Systems Waste Management Solutions (SMART WTE)
- RC Work and Architectural Works to Main Building (CCB) & Waste Bunker including Roof Structures
|
|
|
|
02/03/2020 - 22/09/2021
|
|
|
|
|
|
|
RAPID Project
|
|
|
Muhibbah Engineering Sdn. Bhd.
|
|
|
|
Pengerang, Johor
|
|
|
|
|
|
Provision of Labour for Reinforced Concrete Work
|
|
|
|
Completed on year 2017
|
|
|
Read More »
|
|
|
|
|
RC Works at Substation 521, Field Auxilary Room (FAR521) & Substation 473
|
|
|
|
Completed on year 2018
|
|
|
|
|
|
Package 16A
|
- Re-FEED
- Engineering
- Procurement
- Construction and Commisioning of the Effluent Treatment Plant
|
|
|
|
|
Completed on year 2018
|
|
|
|
|
|
|
|
Cooling Tower Project
|
|
|
MMC Engineering Services Sdn. Bhd.
|
|
|
|
Pengerang, Johor
|
|
|
|
|
|
Package B
|
- Main Civil Works for First Eight (8) Cells of Cooling Tower Structures (30URA) ("the Works") For Pengerang Cogeneration Plant at Refinery and Petrochemical Integrated Development (RAPID) Complex
|
|
|
|
|
Completed on year 2016
|
|
|
|
|
|
|
|
|
|
|
|
Infineon Tower
|
|
|
Nakano Construction Sdn. Bhd.
|
|
|
|
Lot 1604, Mukim Pringgit, Daerah Melaka Tengah, Hangtuah Jaya, Melaka.
|
|
|
|
|
|
Infineon Tower
|
- 11 Storey Office
- 4 Storey Production
- 5 Storey Central Utilities Building (CUB)
|
|
|
|
|
01/10/2020 – 31/12/2021
|
|
|
|
|
|
|
AIMS Cyberjaya Data Centre
|
|
|
Nakano Construction Sdn. Bhd.
|
|
|
|
Lot 10300 (PT 45816) Jalan Teknokrat ½, Cyberjaya, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan.
|
|
|
|
|
|
Cadangan Pembangunan 1 Blok Pejabat Bagi Pusat Data
|
|
|
|
Completed on 28/11/2020
|
|
|
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
Lot 10300 (PT 45816) Jalan Teknokrat ½, Cyberjaya, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan.
|
|
|
|
|
|
The enhancement of Turning Plates at Phase 1
|
|
|
|
Completed on 30/4/2020
|
|
|
Read More »
|
|
|
|
|
Remedial Work at Road 4 (Block 6) Northbound and Subsidence Area at Container Yard Block 10 Row C & D
|
|
|
|
Completed on 12/10/2020
|
|
|
|
|
|
|
|
JB Cocoa Food Plant Project
|
|
|
JB Cocoa Sdn. Bhd.
|
|
|
|
Lot CP1, CP3B & CP3D (PTD 2423), Jalan Tanjung A6, Pelabuhan Tanjung Pelepas, Mukim Tanjung Pelepas, Johor Darul Takzim.
|
|
|
|
|
|
Part I
|
- JB Cocoa Warehouse Extension at Pelabuhan Tanjung Pelepas
|
|
Part II, III & IV
|
- Cadangan Membina Tambahan Gudang Kepada Kilang Sediada di atas Lot CP1, CP3B & CP3D (PTD 2423), Jalan Tanjung A6, Pelabuhan Tanjung Pelepas, Mukim Tanjung Pelepas, Johor Darul Takzim Untuk Tetuan JB Cocoa Sdn Bhd.
|
|
|
|
|
Completed on year 2019
|
|
|
|
|
|
|
2 Storey Warehouse 3E Project
|
|
|
MMC Engineering & Construction Sdn. Bhd.
|
|
|
|
Johor Port
|
|
|
|
|
|
Construction and Completion Of Two Storey Warehouse 3E and All Ancillary Works at Johor Port for Johor Port Berhad
|
|
|
|
Completed on year 2018
|
|
|
|
|
|
|
|
|
|
|
|
Water Treatment Plant Project
|
|
|
Salcon MMCB AZSB JV
|
|
|
|
Selangor
|
|
|
|
|
|
Proposed Development of Langat 2, Water Treatment Plant and Water Reticulation System
|
|
|
|
Completed on year 2018
|
|
|
|
|
|
|
Water Treatment Plant Project
|
|
|
Southern Water Technology Sdn. Bhd.
|
|
|
|
Kota Tinggi, Johor
|
|
|
|
|
|
Proposed upgrading, rehabilitation and extension of existing Semangar Water Treatment Plant
|
|
|
|
Completed on year 2012
|
|
|
|
|
|
|
|
|
|
|
|
Addition & Alteration to Existing Car Exhibition Building Office & Service Workshop
|
|
|
Cycle & Carriage Johor Bahru
|
|
|
|
Lot 102, Jalan Skudai, 5, 1/2 Miles, 81200 Johor Bahru, Johor
|
|
|
|
|
|
Proposed Addition & Alteration to Existing Car Exhibition Building Office & Service Workshop of Mercedez Benz
|
|
|
|
Completed on year 2019
|
|
|
|
|
|
|
Senai Airport City 2
|
|
|
MMC Engineering Sdn Bhd
|
|
|
|
Lot PTD 175352, Mukim Tebrau, Daerah Johor Bahru, Johor Darul Takzim
|
|
|
|
|
|
Phase 2 – Infrastructure Works for Lot PTD 175351 and Jalan SAC 2 & Detention Pond No.12
|
|
|
|
02/11/2020 – 31/03/2022
|
|
|
|
|
|
|
Pavement Maintenance
|
|
|
Pelabuhan Tanjung Pelepas (PTP)
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
|
|
Remedial Work of Pavement Maintenance at Bypass Lane at Blok 7A/7B, 8L/8M & 8LA & PTP Area
|
|
|
|
05/10/2021 – 31/12/2021
|
|
|
|
|
|
|
|
EPCC (GRAPHITE)
|
|
|
MMC Engineering & Construction Sdn. Bhd.
|
|
|
|
Kerteh, Terengganu
|
|
|
|
|
|
Engineering, Procurement, Construction and Commissioning (EPCC) of PGU-I Gas Pipeline Replacement Project (Graphite)
|
|
|
|
14/06/2021 – 13/10/2021
|
|
|
|
|
|
|
Maintenance Terminal Yard
|
|
|
Pelabuhan Tanjung Pelepas (PTP)
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
|
|
Part II: Maintenance & Remedial Works of Terminal Yard at Pelabuhan Tanjung Pelepas
- Upgrading Wharf Road
- Enhancement of Turning plate
- Upgrading for Subsidence Area
|
|
|
|
21/06/2018 – 04/07/2021
|
|
|
|
|
|
|
Road Works Improvement
|
|
|
MMC Engineering Sdn. Bhd.
|
|
|
|
North Port, Klang
|
|
|
|
|
|
Road Works Improvement
|
|
|
|
Completed on March 2021
|
|
|
|
|
|
|
|
Upgrading Jetty
|
|
|
Sapura Fabrication Sdn. Bhd.
|
|
|
|
Sapura Lumut
|
|
|
|
|
|
Upgrading the Jetty 1, 4, 5, 8
|
- Piling Work
- Civil Work
- RC Work
|
|
|
|
|
Completed on April 2021
|
|
|
|
|
|
|
Road Work Project
|
|
|
MMC Engineering Services Sdn. Bhd.
|
|
|
|
Pengerang, Johor
|
|
|
|
|
|
Permanent Access Roadworks for Pengerang Cogeneration Plant at Refinery and Petrochemical Integrated Development (RAPID) Complex at Pengerang in Johor
|
|
|
|
Completed on year 2016
|
|
|
|
|
|
|
Construction of Administrative Buildings & Facilities
|
|
|
Kem Askar Timbalan Setia Negeri (TSN)
|
|
|
|
Kem Askar Timbalan Setia Negeri (TSN), Bandar Johor Bahru, Johor Darul Takzim
|
|
|
|
|
|
Bangunan pentadbiran dan kemudahan Kem Askar, bangunan kemudahan dan infrastruktur dan utiliti
|
|
|
|
Completed on year 2015
|
|
|
|
|
|
|
|
Construction in Pelabuhan Tanjung Pelepas
|
|
|
MMC Engineering & Construction Sdn. Bhd.
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
|
|
Construction and completion of outfall structure No.1 & 2 / Distripark 3 nos of sub-station building / CTY Phase II / Road works
|
|
|
|
Completed year 2007
|
|
|
Read More »
|
|
|
|
|
The Construction, Completion and Maintenance of New Container Terminal Yard Infra Structure, Road Works and Workshop Buildings
|
|
|
|
Completed on year 2014
|
|
|
|
|
|
|
|
Construction of Crane Rail Support
|
|
|
Leycom Maritime Sdn Bhd
|
|
|
|
Lumut, Perak
|
|
|
|
|
|
The Construction and Completion of Crane Rail Support in Relation to the Land Transportation and Assembly of Five (5) IMPSA Quay Cranes
|
|
|
|
Completed on year 2013
|
|
|
|
|
|
|
Project Works in Pelabuhan Tanjung Pelepas
|
|
|
Pelabuhan Tanjung Pelepas Sdn. Bhd.
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
|
|
Remedial and Maintenance Work at PTP Phase 1 including roadworks (concrete pavement, premix and interlocking) and drainage, extension of existing building
|
|
|
|
Completed on year 2007
|
|
|
Read More »
|
|
|
|
|
Phase II the construction , completion and maintenance of container terminal yard Block 16, 17 & 18 (Completion of Raw A ~ D 4 rows of Block 16, 17 & 18)
|
|
|
|
Completed on year 2010
|
|
|
|
|
|
The construction, completion & maintenance for extension of existing container repairs area & associated works at Pelabuhan Tanjung Pelepas (PTP)
|
|
|
|
Completed on year 2011
|
|
|
|
|
|
The Construction and Completion of New Motorcycle & Car Park Works at PUB Area at Pelabuhan Tanjung Pelepas
|
|
|
|
Completed on April 2012
|
|
|
|
|
|
Premix Resurfacing Work at Distripark Area
|
|
|
|
Completed on September 2020
|
|
|
|
|
|
|
|
|
Shrimp Hatchery
|
|
|
ML Construction Sdn Bhd (KAJIMA)
|
|
|
|
Kota Tinggi, Johor Darul Takzim
|
|
|
|
|
|
"Shrimp Hatchery" Lembah Makanan Organik Oleh Perbadanan Bioteknologi & Biodiversiti
|
|
|
|
Completed on year 2011
|
|
|
|
|
|
|
Road Work Project
|
|
|
SP Mulia Sdn. Bhd
|
|
|
|
Taman Impian Emas, Mukim Tebrau, Daerah Johor Bahru
|
|
|
|
|
|
Cadangan membina dan menyiapkan Jalan Utama dari Jalan Seelong
|
|
|
|
Completed on year 2010
|
|
|
|
|
|
|
Construction in Pelabuhan Tanjung Pelepas
|
|
|
MMC Engineering & Construction Sdn. Bhd.
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
|
|
Additional works at CTY 13 ~ 15
- CTY 13 ~ 15, The construction, completion and maintenance road works and associated works
- CTY 13 ~ 15, Sub-contract for the construction & completion of substation building, utilities trench works and associated works
- CTY 13 ~ 15, The construction, completion & maintenance of Civil and structural works for container stacks, Drainage, Foundation for refer stacks & associated works
- Back of wharf, road works , road marking, unterlocking, pavement laying
|
|
|
|
Completed on year 2008
|
|
|
|
|
|
|
Construction in Pelabuhan Tanjung Pelepas
|
|
|
MMC Engineering Services Sdn Bhd
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
|
|
Additional works at CTY 16 ~ 21
- Phase II: The Construction, Completion and Maintenance of Container Terminal Yard Blocks 16, 17 & 18 (Row E to M) and Blocks 19, 20 & 21 (Row A to D)
- Subcontract for Site Clearance, Earthworks, Container Yard Structures, Roadworks & Pavement, Road Furniture and Drainage
|
|
|
|
Completed on year 2014
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KPJ Johor Specialist Project
|
|
|
KPJ Johor Specialist
|
|
|
|
Lot PTD 91374, Jalan Saujana Utama, Taman Saujana Kluang, Daerah Kluang, Johor Darul Takzim.
|
|
|
|
|
|
Cadangan ubahan tambahan di bawah undang-undang kecil bangunan Seragam 1686 ke atas aras 1,3 dan 4 yang merangkumi ruang sessional clinic (PCB). Health screening dan ruang temporary audiologi
|
|
|
|
Completed on 29/02/2020
|
|
|
Read More »
|
|
|
|
|
Cadangan membina sebuah bangunan tambahan Hospital 9 Tingkat Fasa 1 dan Fasa 2
|
|
|
|
Completed on 29/02/2021
|
|
|
|
|
|
- Cadangan membina Hospital Pakar 8 tingkat, Taman Bukit Dahlia
- Cadangan uahan tambahan ke atas aras 4, 5, 6, dan 7 (Inpatient), Hospital Pakar Johor
- Cadangan ubahan, tambahan dan menyiapkan bangunan tambahan enam (6) tingkat
|
|
|
|
Completed on year 2014
|
|
|
|
|
|
|
|
Iskandar Gleneagles Medini Hospital Development
|
|
|
Obayashi Corporation (Malaysia) Sdn. Bhd.
|
|
|
|
Iskandar Gleneagles Medini Hospital, Mukim Pulai, Nusajaya, Johor Darul Takzim
|
|
|
|
|
|
Proposed Iskandar Gleneagles Medini Hospital Development
|
|
|
|
Completed on year 2015
|
|
|
|
|
|
|
|
|
|
|
|
School Project
|
|
|
Detect Engineering Sdn. Bhd.
|
|
|
|
|
|
Lot PTD 154971, Mukim Pulai, Daerah Johor Bahru, Johor DT.
|
|
|
|
Cadangan Pembangunan Sekolah Menengah Berasrama Penuh Di Atas Sebahagian Lot PTD 154971, Mukim Pulai, Daerah Johor Bahru, Johor DT. – Academic Block.
|
|
|
|
Completed on year 2011
|
|
|
Read More »
|
|
|
|
|
Benut, Johor
|
|
|
|
Membina dan menyiapkan 2 blok 4 tingkat bangunan gantian dan lain-lain kerja berkaitan, di Sek Keb. Seri Semangat, Benut, Johor.
|
|
|
|
Completed on year 2011
|
|
|
|
|
|
|
|
|
|
|
|
|
Container Terminal Yard and Ancillary Works Project
|
|
|
Johor Port Berhad
|
|
|
|
Johor Port
|
|
|
|
|
|
Rehabilitation Works of Container Terminal Yard and Ancillary Works at Johor Port
- Interlocking Pavement at Yard 6C3
- Completion of Weighbridge
|
|
|
|
Completed on year 2015
|
|
|
|
|
|
|
Cameron Subsea Facilities (Phase II)
|
|
|
Zublin – Pasukhas Joint Venture
|
|
|
|
Tanjung Pelepas Johor, Johor
|
|
|
|
|
|
Cameron Subsea facilities (Phase II) Tanjung Pelepas Johor, Johor – Plant work
|
|
|
|
Completed on October 2009
|
|
|
|
|
|
|
|
|
|
|
|
Bungalow Show House Type J "Monte Carlo"
|
|
|
Ekovest Construction Sdn. Bhd.
|
|
|
|
Lot PTB 20704, Batu 4-1/2, Jalan Skudai, Danga Bay, Johor
|
|
|
|
|
|
The Execution And Completion of Bungalow Show House Type J "Monte Carlo"
|
|
|
|
Completed on year 2011
|
|
|
|
|
|
|
|
|
|
|
|
Hap Seng Business Park
|
|
|
Hap Seng Logistics Sdn. Bhd.
|
|
|
|
No 12 (PT 364), Persiaran Perusahaan Seksyen 23, 40300 Shah Alam, Selangor.
|
|
|
|
|
|
Cadangan Pembangunan Skim Perindustrian Berstrata di No 12 (PT 364), Persiaran Perusahaan Seksyen 23, 40300 Shah Alam, Selangor (RC Structure Subcontract for Labour & Formworks)
|
|
|
|
Completed on 31/3/2020
|
|
|
|
|
|
|
Membina Tambahan Pawagam
|
|
|
BLHE Sdn. Bhd.
|
|
|
|
AEON Nusajaya, Mukim Pulai, Johor
|
|
|
|
|
|
Cadangan Membina Tambahan Pawagam di Kompleks Membeli-belah (AEON) sediada di Nusajaya, Mukim Pulai, Johor.
|
|
|
|
Completed on year 2011
|
|
|
|
|
|
|
Sankyu Project
|
|
|
Sankyu Southeast Asia Holdings Pte. Ltd.
|
|
|
|
PTD 203244, Bandar Medini Iskandar Malaysia, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim
|
|
|
|
|
|
Cadangan Membina Seduan Institusi Latihan Persendirian Yang Mengandungi
- 1 Blok Pejabat 2 Tingkat
- 1 Blok Asrama 3 Tingkat (47 Unit Bilik)
- 1 Blok Pusat Latihan 2 Tingkat
- 1 Unit Pondok Pengawal
- 1 Unit Pencawang Elektrik
|
|
|
|
Completed on year 2011
|
|
|
|
|
|
|
|
|
|
|
|
Senai Airport Project
|
|
|
Senai Airport Terminal
|
|
|
|
Senai Airport
|
|
|
|
|
|
- Proposed Development of ‘’Senai Airport City’’ Appointment of Sub-Contractors for Senai Airport City (SAC) Phase 1(b)
- Senai Airport Aviation Centre : Phase 2 The Provision of a New VVIP Hangar, Parking Apron, Taxiways and Associated Works at Senai International Airport
|
|
|
|
Completed on year 2015
|
|
|
|
|
|
|
Wharf Work
|
|
|
Zelan Construction Sdn. Bhd.
|
|
|
|
Pelabuhan Tanjung Pelepas
|
|
|
|
|
|
- The Construction, Completion and Maintenance of Wharf Structures Berth 13 & 14 and Back of Wharf Works
- Subcontract for Earthworks, Drainage Works, Road Marking & Furniture, Pavement, Utility and Building Structure Works and Precast
|
|
|
|
Completed on year 2014
|
|
|
|
|
|
|
Earthworks & Ancillaries Work
|
|
|
Crescendo Infra Sdn. Bhd.
|
|
|
|
PLO 3 Jalan Pekeliling Pasir Gudang, Johor
|
|
|
|
|
|
- The Construction, Completion and Maintenance of Wharf Structures Berth 13 & 14 and Back of Wharf Works
- Subcontract for Earthworks, Drainage Works, Road Marking & Furniture, Pavement, Utility and Building Structure Works and Precast
|
|
|
|
Completed on year 2009
|
|
|
|
|
|
|
Earthwork & Drainage Project
|
|
|
SP Setia
|
|
|
|
|
|
Zone 3, PTD 117035 Setia Business Park II, Mukim Tebrau Daerah, Johor Bahru
|
|
|
|
- 116 Units (RMM) Double Storey Cluster Terrace Houses (18"x 60") & 30 Units (RMM) Double Storey Terrace Houses (18" x 60")
- 174 Units (RMM) Double Storey Cluster Terrace Houses (18"x 60") & 35 Units (RMM) Double Storey Terrace Houses (18"x 60")
|
|
|
|
Completed on August 2018
|
|
|
Read More »
|
|
|
|
|
Lot PTD 63733, Mukim Tebrau, Daerah Johor Bahru
|
|
|
|
Pembinaan, Penyiapan dan Penyelenggaraan untuk Cadangan Jalan, Perparitan dan Kerja-Kerja Berkaitan untuk Precint 7 dan Sebahagian Precint 8 & 9
|
|
|
|
Completed on year 2012
|
|
|
|
|
|
Lot PTD 63733, Taman Setia Tropical, Mukim Tebrau, Daerah Johor Bahru, Johor Daruk Takzim
|
|
|
|
Pembinaan, Penyiapkan dan Penyelenggaraan untuk kerja-kerja tanah, perparitan sementara dan kerja-kerja berkaitan untuk Lot perdagangan di sebahagian Precint 1
|
|
|
|
Completed on year 2010
|
|
|
|
|
|
|
|
|
|
|